Generator Information
  Solar Photovoltaic
Fuel Type Attributes:
(select all that apply)
Connecticut
Class I Renewable Energy Source:   (check for yes) -- If yes Reveal Output to Regulators must be checked
Class I low emission eligible energy source ("LREC"):   (check for yes) -- If yes Reveal Output to Regulators must be checked
Class II Renewable Energy Source:   (check for yes) -- If yes Reveal Output to Regulators must be checked
Class III Portfolio Standard: -- If yes Reveal Output to Regulators must be checked
State Certification Number:
Date of Eligibility:   (format: MM/YYYY)
CT CEO Eligible:   (check for yes)
R-O-R Hydro: Percentage Qualifying as Class I:
Massachusetts
RPS Class I Renewable Generation Unit:   (check for yes)
Percentage of Generation Qualifying as RPS Class I: **
Solar Carve-Out I Unit:   (check for yes)
Solar Carve-Out I Unit Expiration of Opt-In Term:   (format: MM/YYYY)
Solar Carve-Out II Unit:   (check for yes)
Solar Carve-Out II Factor:
Solar Carve-Out II Unit Expiration of Opt-In Term:   (format: MM/YYYY)
RPS Class II Renewable Generation Unit:   (check for yes)
Percentage of Generation Qualifying as RPS Class II: **
RPS Class II Waste Energy Generation Unit:   (check for yes)
APS Alternative Generation Unit:   (check for yes)
Generation level per year or Energy imported per year above which qualifies as RPS New Renewable Resource:   (MWh)
RPS Statement Of Qualification Number:   (format: AB1234YY)
Eligible MA Renewable for NOx allowances claims from Public Benefit set-a-side:   (check for yes)
MA Renewable NOx State Certification Number:
MA CES:   (check for yes)
Maine
Class I New Renewable Energy Resource Qualification:   (check for yes)
Class II Eligible Resource:   (check for yes)
Community Based Renewable Energy:   (check for yes)
Eligible for C02 Netting:   (check for yes)
State Certification Number:
Date of Eligibility:   (format: MM/YYYY)
Rhode Island - Existing Renewable Energy Resource
Existing Renewable Energy Resource:   (check for yes)
Requires an Independent Verifier for Non-Nepool Generator if checked
Generation level per year above which qualifies as an Existing Renewable Energy Resource:
State Certification Number:
Date of Eligibility:   (format: MM/YYYY)
Percentage of average annual production meeting the requirements for eligibility as an Existing Renewable Energy Resource: **
 
Rhode Island - New Renewable Energy Resource
New Renewable Energy Resource:   (check for yes)
Requires an Independent Verifier for Non-Nepool Generator if checked
Generation level per year above which qualifies as a New Renewable Energy Resource:
State Certification Number:
Date of Eligibility:   (format: MM/YYYY)
Percentage of average annual production attributable to the efficiency improvements of additions of capacity placed in service after Dec 31, 1997: **
 
New Hampshire
Class I Source:   (check for yes)
Average annual electric production (in MWh) from a facility other than hydroelectric from 2004 through 2006, or for the first 36 months after commercial operation if that date is after December 31, 2001:   (MWh)
Average annual production (in MWh) of a hydroelectric facility from the later of January 1, 1986 or the date of first commercial operation through December 31, 2005 (if such a facility was upgraded or expanded during this baseline period, actual generation should be adjusted to estimate the average annual production that would have occurred had the upgrade or expansion been in place for this entire period):   (MWh)
Class I Useful Thermal Energy:   (check for yes)
Class I Biodiesel Producer:   (check for yes)
Class II Source:   (check for yes)
Class III Source:   (check for yes)
Class IV Source:   (check for yes)
State Certification Number:
Date of Eligibility:   (format: MM/YYYY)
 
Vermont
Tier I:   (check for yes)
Tier II:   (check for yes)
State Certification Number:
Date of Eligibility:   (format: MM/YYYY)
 
Meter
Independent Verifier:
 
Green-E Certification
Green-E Eligible:   (check for yes)
Green-E Fuel Type:
 
Low Impact Hydro Institute Certification
Low Impact Hydro Institute Eligible:   (check for yes)
 
Reveal Output to Regulators:   (check for yes)
 
* Required Field     ** For Existing Renewable Energy Resource + New Renewable Energy Resource, then total percenatge must = 100% or leave both blank
GIS Administrator Area
Notes:
Date1 Note LoginName
No prior notes have been entered.
Notes
Privacy Policy